Cost Of Construction in Bangalore

Click To Call: 9573710024

How can I calculate cost of my Home Construction in Bangalore?

  • Curious to know more about construction cost?
  • Want to have an accurate estimate of your construction project?

Get answers to All those and many more questions at Renox.in Exclusive Home Construction division of Bangalore.

Here, we extend an friendly support to our clients looking for constructing their homes in Bangalore.

Get near to exact cost of construction anywhere in Bangalore, be it an independent Home or an Duplex, Triplex, Villa or a multi storied complex.


Construction Cost Components
Approval Fees Cost

Approval cost is the first step in this regard which ensures smooth construction process. Usually, building material takes up to 60% of total cost and includes raw materials needed for the job.

Approval cost is one of the crucial aspects of construction as it also takes up the significant amount of time to get approved. Renox does this tedious task with ease and having ample experience in the field, the process is done quite smoothly and relaxed way. With the right planning and following the norms needed, the approval is made to be finalized in lesser time as possible.

Material Cost

Building material cost contributes nearly 50 to 60 percentage of the total construction cost of any building construction project. Items used are Cement, Sand, Steel, Gravel, Bricks, Plumbing, Electrical, Tiles, Granite Slabs, Paint, Wood, Timber, Glass etc.

Cost of Steel: Rs.65,000 per Ton, Sand: Rs.1,800 per Ton, Cement: Rs.380 per bag, Bricks: Rs.7 per piece, Wooden Door Frame (Teak): Rs.8,000 per piece, Wooden Door Frames (Non Teak): Rs.4,500 per piece, Windows (UPVC): Rs.525 per Sq Ft, Electrical Wires (1 sq mm): Rs.900 per 90 mtrs. etc...

Transport & Handling

Building materials are usually brought from far away distances or are manufactured elsewhere, hence need to be transported to the site or the place where they are required for the construction project. Also, construction materials are bulky and heavy hence costs more for transportation

Besides this, all of those construction materials are to be lifted to desired places, hence handling charges are incurred which are labour charges for lifting and placing those materials for the work to happen.

Labour Charges

Labour charges or Workers cost is the second biggest cost factor of any construction project, including Bangalore, Bengaluru.

Right from the excavation to the final painting and cleaning of the site before handover to clients, every construction activity is highly labour intensive and consumes lots of man hours to complete.

Tentatively, combined labour charges of all the works involved in a construction project contributes almost 35 to 40 percent of the total construction cost in Bangalore.

Construction Cost Management

Planning & Control

Before you actually start your construction project, no matter how large or small it be, first have a clear idea about your exact requirement from the new construction project on paper and then adhere to it fully in the whole process thereafter to keep it in control and smoother progress of the work.

Allocate Budget & Adhere

As in any other projects, even in building construction work there is every chance of exceeding predetermined budget for construction project unless you have a clear figure of budget in the first place and strictly manage your spending while selecting materials, labour work and other costs.

Find Right Contractor

Identify right and competent contractor, company or service provider to undertake your New Construction project, get everything in quote including the material selection along with budget and time line of completion and milestones for payments for the material suppliers and labour contractors.

Itemized Construction Cost Calculators

Steel Cost

Cost Rs.65,000/- per ton.

Construction Area in Sft:



Total = Rs. 


Sand Cost

Sand Cost Rs.1,800/- per ton.

Construction Area in Sft:



Total = Rs. 


Gravel / Metal Stone

Gravel Cost Rs.450/- per ton.

Construction Area in Sft:



Total = Rs. 


Cement Cost

Cement Cost Rs.380/- per bag.

Construction Area in Sft:



Total = Rs. 


Bricks Cost

Brick Cost Rs.8/- per piece.

Construction Area in Sft:



Total = Rs. 


Electrical Cost

Conduits, Wires, Switches etc.

Construction Area in Sft:



Total = Rs. 


Plumbing Cost

Plumbing Material and Labour

Construction Area in Sft:



Total = Rs. 


Tiles Cost (All Flooring)

Vitrified Tiles, Ceramic Tiles, Parking Tiles.

Construction Area in Sft:



Total = Rs. 


Teak Door Frame & Shutter

Teak Wood Main Door Set.

Number of Pieces Required:



Total = Rs. 


Non Teak Frame & Flush Doors

Hard Wood Door Set.

Number of Pieces Required:



Total = Rs. 


Windows & Ventilators

UPVC Sliding Glass with Mosquito Screen.

Construction Area in Sft:



Total = Rs. 


Granite Stone Slabs

Granite of Rs.150 per Sq Ft.

Construction Area in Sft:



Total = Rs. 


Fabrication Charges

Grills, Fencing & Gate.

Construction Area in Sft:



Total = Rs. 


Painting Charges (Putty Finish)

Asian Paints Brand (Premium).

Construction Area in Sft:



Total = Rs. 


Glass & Mirrors

Saint Gobain Brand.

Construction Area in Sft:



Total = Rs. 


Construction Cost Estimator
Economy Construction
Area in Sft:



Total = Rs. 


Modest Construction
Area in Sft:



Total = Rs. 


Premium Construction
Area in Sft:



Total = Rs. 


Luxury Construction
Area in Sft:



Total = Rs. 


Construction Cost & Material Specification
SNo.Brief Details of Construction Materials & Costs Cost Per Sq Ft.
A Construction Cost
1 Civil: Foundation, Columns, Beams, Slab, Stairs, Brick work, Plastering - per Sq Ft of Floor Area. Rs.880 to Rs.1250
2 Finishing Materials: Plumbing, Electrical, Flooring, Tiles, Granite/Marble, Doors, Windows, Painting, Steel Fabrication - per Sq Ft of Floor Area. Rs.550 to Rs.1850
B Total: Rs.1430 to Rs.3100
C Material Specifications
1 Civil: Foundation, Columns, Beams, Slab, Stairs: 53 Grade ISI marked cement, steel. Corse sand and appropriate gauge granite gravel.
2 Brick Work: Normal Machine Cut Bricks for Ground Floor, Light weight Machine Cut Bricks from First Floor Level Onwards.
3 Plastering: Appropriate admixture of cement and sand in two coats of plastering with a smooth finish on second coat surface.
4 Plumbing: Flowguard Technology - Ashirwad/Astral CPVC Hot/Cold pipes for water inlet, Appropriate gauge of PVC pipes for Drainage outlet piping. ISI mark plumbing fittings. WC's, Wash Basins, Diverters, Taps, Angle Cocks, Health Faucets etc. (These items can alter the final cost)
5 Electrical: ISI marked - FRLS (Fire Retardant Low Smoke) cables of appropriate gauge and thickness of Finolex/Finecab/Polycab Brand, ISI marked MCBs of Appropriate Values, Modular Switches, Sockets and Dimmers of Anchor/GoldMedal/GM Brand (These items can alter the final cost)
6 Flooring: Granite: Rs.100/- per Sq Ft where ever used as flooring. (These items can alter the final cost)
7 Tiles: Vitrified Tiles where ever used as flooring, Wall Tiles, Exterior Cladding Tiles. (These items can alter the final cost)
8 Doors: Main Door Frame and shutter in Indian Teak. Internal Door frames in Hard wood and Laminated Flush doors or Panel Doors as shutters. (These items can alter the final cost)
9 Windows & Ventilators: UPVC windows and Ventilators with warrantee. (These items can alter the final cost)
10 Painting: Smooth Putty Finish on internal surface with two coats of Asian Paints Premium Emulsion Paint in Roller Finish, Doors, Window Grills, Railings & Gate in Asian Paints Satin Enamel paint in Roller Finish. Exterior Front Elevation in Texture finish. (These items can alter the final cost)
11 Steel Fabrication: ISI marked steel for Window grills, Railings for balcony and stairs, Gate. (These items can alter the final cost)
Team Renox.in wishes you and your Family a very Happy & Pleasant New Home!

50+ Construction Experts
500+ Building Plans
500+ Home's Built
10+ Cities Served

Design & Build Construction Services in Bangalore
Easy - Construction Solutions
Tell Us Your Construction RequirementDiscuss Your Construction Requirement

Our experts would love to hear everything about your Construction project.

Get Construction Cost EstimatesComparative Construction Cost Estimates

Get transparent construction estimates in three options - Economy, Modest & Premium.

Complete Construction Project SupportComplete Construction Project Support

Guidance, Tips, Suggestion and advice from people with 30+ years experience.


Construction Cost For 1400 Sft
Details Cost
Concrete Structure - Steel, Sand, Cement, Gravel, Labour Cost 600,000
Brick Work - Walls - Bricks, Sand, Cement, Labour Cost 580,000
Electrical & Plumbing - Materials & Labour Cost 370,000
Doors & Windows - Materials & Labour Cost 110,000
Flooring - Tiles - Granite - Materials & Labour Cost 280,000
Painting & Polishing - Materials & Labour Cost 230,000
Fabrication & Glass - Materials & Labour Cost 70,000
Total 2,240,000
Construction Cost For 1800 Sft
Details Cost
Concrete Structure - Steel, Sand, Cement, Gravel, Labour Cost 7,71,000
Brick Work - Walls - Bricks, Sand, Cement, Labour Cost 7,45,000
Electrical & Plumbing - Materials & Labour Cost 4,76,000
Doors & Windows - Materials & Labour Cost 1,40,000
Flooring - Tiles - Granite - Materials & Labour Cost 3,60,000
Painting & Polishing - Materials & Labour Cost 2,95,000
Fabrication & Glass - Materials & Labour Cost 90,000
Total 28,77,000
Construction Cost For 2400 Sft
Details Cost
Concrete Structure - Steel, Sand, Cement, Gravel, Labour Cost 10,28,000
Brick Work - Walls - Bricks, Sand, Cement, Labour Cost 9,95,000
Electrical & Plumbing - Materials & Labour Cost 6,35,000
Doors & Windows - Materials & Labour Cost 1,90,000
Flooring - Tiles - Granite - Materials & Labour Cost 4,80,000
Painting & Polishing - Materials & Labour Cost 3,95,000
Fabrication & Glass - Materials & Labour Cost 1,20,000
Total 38,43,000
Construction Cost For 4500 Sft
Details Cost
Concrete Structure - Steel, Sand, Cement, Gravel, Labour Cost 19,30,000
Brick Work - Walls - Bricks, Sand, Cement, Labour Cost 18,65,000
Electrical & Plumbing - Materials & Labour Cost 11,90,000
Doors & Windows - Materials & Labour Cost 3,55,000
Flooring - Tiles - Granite - Materials & Labour Cost 9,00,000
Painting & Polishing - Materials & Labour Cost 7,50,000
Fabrication & Glass - Materials & Labour Cost 2,25,000
Total 72,15,000

Typical Cost Of Construction in Bangalore

Get a single level 1200 sq ft home construction with modest quality long lasting materials and warranted workmanship at Rs.2,240,000/- in Bangalore


Designer 4 BHK Duplex 1600 Sq Ft G+1 made in good quality building materials and warranted workmanship at Rs.28,77,000/- in Bangalore from construction Experts.


Lavish 5.5 BHK 2400 Sq Ft G+2 Triplex constructed on your plot with contemporary planning and design, selected finishing materials and warranted workmanship at Rs.38,43,000/- in Bangalore.


High End Luxury Villa expansively built with 5 bedrooms, study, home theater, 4500 Sq Ft of floor space having G+3 level structure to accommodate every latest feature of modern intelligent house and home automation available at Rs.72,15,000/- in Bangalore, Bengaluru.


Construction Services, Contractors & Companies in Bangalore

Contact Renox.in
Renox Logo
Renox.in
Domlur,Bangalore- India.Whatsapp or SMS: 9573710024

  1. Renox.in
  2. Bangalore
  3. Construction
  4. Construction Cost
  5. Construction Cost in Bangalore
  6. 10-06-2018
Cost Of Construction in Bangalore | Renox.in

Contact Renox.in
Renox Logo
Renox.in

India.Call: Renox.in Whatsapp 9573710024

  1. Renox.in
  2. Bangalore
  3. Cost Of Construction
  4. Cost Of Construction in Bangalore
  5. 12-07-2018
Terms   Privacy   Renox on Facebook   Renox on Google Plus   Renox on Twitter   Shoklee.com Icon